Project Health Evaluation

Project Health Evaluation

Purpose

Measure whether governance actually improves the project instead of merely adding process.

Core Dimensions

Score only dimensions that matter to the project.

1. Discoverability

Can a new agent find the main entry points quickly?

2. Predictability

Can the likely location of a file be inferred from its role?

3. Traceability

Can important changes be connected to versions, branches, releases, or other recoverable states?

4. Recoverability

Can risky work be rolled back or restored?

5. Documentation coherence

Do active documents agree about important project facts?

6. Lifecycle hygiene

Are obsolete, temporary, generated, and archived materials controlled?

7. Structural debt

How much unexplained entropy has accumulated?

8. Handoff cost

How much context must a new human or agent reconstruct before productive work?

Lightweight Score

Use a 0-3 scale when a numerical view is useful:

  • 0 = unmanaged
  • 1 = inconsistent
  • 2 = mostly healthy
  • 3 = clear and reliable

Do not manufacture precision.

Trigger-Based Review

A useful review rhythm is event-based rather than time-based:

  • after major releases
  • after major refactors
  • before a large migration
  • before project handoff
  • after repeated confusion about location or current state
  • when structural debt becomes noticeable

Do not schedule full audits simply because time has elapsed unless the project benefits from them.

Success Metrics

Possible longitudinal metrics:

  • time for a new agent to orient itself
  • number of duplicate/obsolete documents
  • number of orphaned files
  • number of unsafe changes caught before execution
  • rollback success rate
  • percentage of major changes with recoverable checkpoints
  • frequency of conflicting sources of truth
  • structural cleanup effort per milestone

The best metric is whether the project becomes easier to change without becoming harder to understand.